PEDEROBBA, ITALY 2005 – 2006

Client: Cementi Rossi S.p.A., TAI S.r.l.

This project consisted of the seismic evaluation and seismic improvement of a 73m high cyclone tower at a cement production plant.

  • Construction of the Cyclone Towers
  • Construction site Cyclone towers

Carbon fibers highly resistant to elevated temperatures EB- FRP were used for the reinforcement.

Due to the high operating temperature of the structure (85 ° C), an epoxy resin tailored for this application was developed and tested. This project is one of the first applications worldwide of a resin of this type.