S. AGATA DI PUGLIA (FG), ITALY – 2014

Client: SPED S.r.l.

ASDEA was tasked with the relevant structural design of the steel structures supporting the fume treatment of a 25 MW biomass-fired thermoelectric power plant (reaction tower, sleeve filter, plate exchanger, reactor, dust storage silos, ammonia storage silo).

Biomass power plant site

The structural design was completed in accordance with the most recent national and European regulations (NTC08, EC3, and EC8), capitalizing on the dissipative capacity of the structures to significantly reduce weight and optimize production costs